Vaggelis Dedes

Vaggelis Dedes

Vaggelis Dedes
More ideas from Vaggelis
FLUE PIPE. Minimum clearance from combustible material: 450 mm (18 in.). The minimum clearance may be reduced by 50 percent to 225 mm (9 in.) if suitable shielding is installed either on the pipe or on the combustible surface.

Minimum clearance from combustible material: 450 mm in. The minimum clearance may be reduced by 50 percent to 225 mm in.) if suitable shielding is installed either on the pipe or on the combustible surface.

Who? Me? More

Who? Me? More